Power requirement for paper and pulp manufacturing plant
Quickly adapting power requirement for paper and pulp manufacturing plant
- The Challenge
Provide reliable, adaptive power and testing
- The Impact
Reduced fuel costs and improved productivity
- The Solution
Optimised and efficient power and rapid deployment
Client:Tempo Paper
Location:Ogun State, Nigeria
Sectors:Manufacturing
The Challenge
Provide reliable, adaptive power and testing
Tempo are a large, paper manufacturing company, based in Nigeria. It already had a large-scale power solution in place, but the 5.6 MW generator was aging and couldn’t give the customer the reliability they need.
Productivity would suffer eventually if an answer couldn’t be found. This was not an option, so Tempo began the process of looking at all the options available.