2017-12 dairy cows

Dairy-Milk production needed ice water to proceed

Milk production needed ice to proceed

  • The Challenge

    Keeping milk at optimum temperature

  • The Solution

    Ice water at a stable 1oC for round the clock milk production

  • The impact

    Milk kept in tip top condition throughout the process

Sectors:Food and Beverage

The Challenge

Keeping milk at optimum temperature

When the chiller plant at a large dairy broke down, it could have resulted in thousands of litres of spoiled milk, a loss of production and revenue. As the site’s process cooling system used ice water, we needed to find a way to keep this at a steady 1oC, to maintain the milk’s temperature between 3-4oC. Too warm and the milk would spoil – too cold and the water would freeze.

1800 kW chiller
+/- 0,3 Constant temperature range
24/7Round the clock milk production
700 kW chiller - front

Loading component...

"We found a way to deliver ice water at 1⁰C across the entire site, allowing the dairy to keep production running 24/7"

Aggreko Technical Engineer , Food & Beverage Specialist , Worldwide

Loading component...

Loading component...

Loading component...

Tags

  • Food and Beverage
  • Europe

Loading component...