Quick Power For Refinery Commissioning
Rapid, reliable, multi-MW power for refinery commissioning
- The Challenge
Provide precise commissioning power to avoid costly delay in the installation of customer captive power plant
- The Solution
A 53 MW power package at 6.6kV
- The Impact
Customer able to enjoy early production and avoid potential penalties
Location:India
Sectors:Petrochemical and refining
The challenge
Provide commissioning power to avoid costly delay in the installation of customer captive power plant
The customer’s refinery, which was being constructed in India, had experienced delays in the installation of the 100 MW CPP (captive power plant) during late 2011.
There was an unreliable and limited grid power available and commissioning of the refinery could not begin without overcoming this. There were also financial implications involved if the customer were unable to commission and commence operations on time.
They needed 53 MW of reliable, mobile, modular and quick power solutions for the refinery commissioning – and quickly.
Loading component...
The solution
A 53 MW power package at 6.6kV
The Aggreko team studied the processes and understood the exact requirement of various equipment / accessories.
The customised solution of 53 MW at 6.6kV was designed, mobilised and commissioned in a short span of about 60 days.
As a specialist of mobile, modular and turnkey power solutions, Aggreko ensured smooth and uninterrupted power supply at the site, with a technical team available on-site 24/7.
An initial contract was for six months and was then extended until CPP was ready. Extra resources were pulled-in to ensure that our installation was completed in the stipulated time-frame and met customer’s expectations.