Data centre construction

Technicians on site with generators in background

TEMPORARY Power for new build data centres

Building more flexibility into data centre construction

In the construction phase, we can supply reliable power for even the most complex site using our efficient, modular generators. You can choose from diesel, gas or alternative fuels running on HVO, GTL and other biofuels. There’s no need to worry about fuel supply either. We can manage that too, ensuring you have maximum uptime.

Power, heat, dry and cool your data centre build.

You can’t always rely on the grid to power all your construction, heating, drying and climate control needs. But you can always depend on our mobile and modular solutions. 

How can we support data centre construction?

  • We can provide prime power when there is no grid connection
  • We can synchronise our generators and batteries to the grid
  • Panels, transformers and switchgear distribute the power where it is needed
  • Innovative load on demand packages minimise costs and impact on the environment
  • Super silent generators, manufactured with sound-proofing and noise-reducing measures for urban areas
  • Use our climate control solutions to cure the concrete, dry walls and keep areas dust-free
  • Maintain humidity levels for safe installation of critical equipment and protection of equipment warranties
  • Temperature control equipment keeps workers comfortable and safe

 

Talk to us about your project.

Whether you’re constructing a server room or a hyperscale data centre, we have the expertise and solutions to power your project. Simply complete the contact form or give us a call and one of our team will be in touch. 

GET IN TOUCH

 
 

How can we help you?

Get in touch and we’ll help find what’s right for you