Innovative cable pathway solution for data centre commissioning
Aggreko overcame delayed load bank and electrical board access at a new Auckland data centre by designing an innovative cable pathway solution to route heavy cables directly to UPS link boxes on the third floor. This flexible approach enabled the client to complete L3 load testing on time and meet commissioning schedules despite on-site delays.
- The Challenge
Delayed load bank and electrical board access impacting commissioning schedules
- The Solution
Overcoming electrical board absence through innovative cable pathways in a data centre setting
- The Impact
L3 load testing completed on time
Client:A multinational electrical equipment supplier
Location:Auckland, New Zealand
Sectors:Data centres