 Liquid cooled load bank testing: data centre CDU commissioning in Sydney

Aggreko's liquid-cooled load bank solution ensured precise testing of a data centre’s cooling loops, helping validate infrastructure, optimise performance, and maintain a contaminant-free environment.

  • The Challenge

    Level 3 -5 commissioning tests on the CDU

  • The Solution

    Load testing from engineering to decommissioning

  • The Impact

    Data centre commissioning safeguards the reliability of the operations

Client:Leading data centre operator

Location:Sydney, Australia

Sectors:Data centres

Loading component...

1.2MWPower load required per loop
70°CRequired water temperature
12x600kWLiquid cooled load banks