Powering Beverage Production In Energy Crisis

Client
Multinational brewing and beverage company
Location
South Africa
Sector
Food and Beverage
  • The Challenge

    Prevent power outages due to load shedding during harvest season

  • The Solution

    Flexible back-up power with automated start as required

  • The Impact

    Outages eliminated and production maximised throughout harvest

4Generators installed
3monthsInitial contract
4,100kVAStandby power provided
Waist up portrait of young African-American woman holding beer glass while inspecting quality of production at brewing factory, copy space

Loading component...

The Solution

Flexible back-up power with automated start as required

Aggreko sent a team of engineers to the site to understand the loads required for each production process and design a suitable standby solution.

We installed two x 1250 kVA generators and two x 800 kVA generators initially on a three month contract. The generators needed to be configured to kick in automatically as soon as grid power failed.

This was simple to do with the larger generators but as the existing customer equipment was not compatible with Deif controllers we had to convert the 800 kVA generators to DSE.

Our 24/7 call centre means that if any of the generators fail whilst the customer is in production we will have an engineer onsite within half an hour to resolve the issue.

After the first three months, the customer has moved to a longer, flexible contract to support them through their busiest periods. We are also offering them the option of a BOOT (Buy Own Operate Transfer) model to give them maximum flexibility.

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...