Image of crane loading of metal steel rolls.

Power and cooling to keep steel plant rolling

Maintaining metal production with precise power and temperature control

Aggreko partnered with a global steel manufacturer to keep their plant running smoothly by providing 15 MW of reliable power and 12 MW of temperature control annually. With tailored solutions for power, heating, and cooling, Aggreko ensured uninterrupted production, prevented iron ore line freezing, and optimised working conditions year-round.
  • The Challenge

    Devise solutions to provide reliable power and more for market leading manufacturer

  • The Impact

    Business as usual for customer

  • The Solution

    Expert power and temperature control to keep production rolling

Client:Global Steel Manufacturer

Location:Gent, Belgium

Sectors:Manufacturing

The Challenge

Devise solutions to provide reliable energy for steel plant

Arcelor Mittal is a world leading steel manufacturer and mining company. For the production of steel they are heavily dependent on their production plant, which was built around 50 years ago.

The age of the steel plant required an increase on maintenance, as production levels would suffer if the plant ground to a halt. Seasonal changes were also playing havoc, with vital components of the facility being adversely affected by the extreme temperatures.

What Arcelor Mittal needed was a specialist and a partner.

15MWGenerators per year
12MWHVAC equipment per year

Loading component...

Loading component...

The Impact

Business as usual for customer

Arcelor Mittal demanded that production levels be maintained. With our expertise and top-grade equipment, we kept their targets on track.

The aging steel production plant was no longer an issue, we provided the reliability that our customer demanded, and the bespoke answers to their power, heating and cooling challenges.

Loading component...

Loading component...

Loading component...

Loading component...