Rapid and modular power solution to commission world’s largest stacker for ambitious mine project
Aggreko provided a rapidly deployed energy solution to meet the temporary power demands of the world's largest iron ore stacker at BHP's iron ore mine in Western Australia. With 3 MW of power supplied by Aggreko's mobile and modular diesel generators, the project stayed on budget and on track, and the flexible solution allowed for any changes in power demands.
Client: South Flank Mine
Location: Western Australia
Sectors: Mining
The Challenge
Extra power to meet load demands from largest ore stacker in the world
BHP's US$3.6 billion South Flank iron ore mine under construction in Western Australia is one of the most technologically advanced mine projects in the world. Not only is it projected to deliver around 80 Mt of iron ore a year, but it will also harness the latest and greatest innovations in the field to allow the 600 operational staff to ensure productivity.
This will include autonomous-ready haul trucks and the world’s largest rail-mounted mine stacker.
Fact File Heading
The Solution
Devise rapidly deployed power station to ensure new mine project stayed on track
Our extensive experience in the mining sector and our presence in the Pilbara allowed us to devise a solution that would meet the stacker temporary power demands and deploy it rapidly.
We designed, engineered, installed and then commissioned a temporary power station that bridged the power gap for the new technology the mine required – and the installation was completed within weeks.
The solution consisted of 3 MW of power, supplied by our reliable, mobile and modular diesel generators, with enough fuel tanks on site to allow for continuous operation and contingencies. A 33 kV transformer was also part of the power package.
The Impact
Our power supplied within weeks so mine project stayed on budget
Our ability to respond quickly to our customers’ demands, coupled with the modular nature of our equipment, meant that our customer kept all milestones within sight.
It also allowed for a degree of flexibility. So, if power demands ramp up or down, BHP has peace of mind that the power solution can adapt to any change in circumstance.
The end result is that one of the biggest mining projects in the world can continue toward its end goal – on track and on budget.