Steady temperature at chemical processing plant
Steady temperature at chemical processing plant
- The Challenge
Chemical plant needed fast fix when heating and cooling failed
- The Solution
Aggreko heat-pump chiller and 3-way valve keep glycol temperature constant
- The Impact
Aggreko keeps plant running without the need for costly new equipment
Client:Contract chemical manufacturer
Location:Middlesbrough, UK
Sectors:Petrochemical and refining
The challenge
Chemical plant needed fast fix when heating and cooling failed
A contract manufacturer of high quality fine chemicals faced a conundrum. Its heating and cooling had failed – so they couldn’t control the temperature of glycol, which is crucial for the chemical reaction. As a result, production had stalled. Problem was, their equipment was obsolete, so there were no parts available. They needed a fast fix to get the plant up and running again.