Aggreko partnered with a Middle East oil operator to deliver a turn-key flare gas-to-power project, converting 40 million SCF of associated petroleum gas per day into 165 MW of reliable energy for the local grid. 
  • The Challenge

    Complex project needs specialised engineering partner to design and finance the conversion and distribution of 40 Million SCF a day of Associated Petroleum Gas (APG)

  • The Solution

    Turn-key project to treat and separate gas to produce power, including the construction and upgrade of power infrastructure to provide to the local grid

  • The Impact

    Flaring eliminated, oil production maximised and reliable cost effective power to stabilise the local grid

Client:Oil Company

Location:Middle East

Sectors:Oil and Gas

Loading component...

165MWAPG to Power
840tonnesOf CO2 saved per day
24/7 powerFor minimum 4 years