offshore gas platform

Gas site ARM-ed with reliable power

Gas site ARM-ed with reliable power

Aggreko provided a large-scale gas site in remote Western Australia with a reliable, cost-effective power solution using 173 generators and proprietary remote monitoring (ARM) technology. This ensured uninterrupted power, improved efficiency, and allowed the customer to maintain production while reducing operational costs.
  • The Challenge

    Ground-breaking drilling campaign in remote location needs cost-effective power

  • The Solution

    A comprehensive strategy and reliable equipment to deliver efficient power and flexibility to meet all future challenges

  • The Impact

    Search for viable clean energy sources can continue unabated

Client:One of the world's largest oil and gas exploration companies

Location:Western Australia

Sectors:Oil and Gas

The Challenge

Keeping production rolling for a large-scale gas site in remote Western Australia

The customer and other partners had constructed a large-scale offshore gas platform that would produce 8.9 million tonnes of LNG per year.

The structure stood taller than two rugby fields in 70m of water, drilling nearly 3,000m under the sea floor.

This ambitious project then delivered the oil pulled up from the offshore location to a refinery, but they needed an uninterruptible power supply to meet the demand, and the needed to keep costs down. That's where our expertise came in.

 

173Generators
8000Workers
9Maintenance services every day