Data centre commissioning

We offer specialised power, cooling and load testing to ensure data centre facilities perform optimally before going live. We help prevent delays and ensure performance during critical testing phases, supporting data centres from initial setup through to ongoing operations with sustainable energy options. 

From data centre planning to data centre testing, we can help to get your project off the ground.

Data centre commissioning is the process of verifying that every system in your facility, from power distribution and cooling to dehumidification and controls, performs to design specification before go-live. It is a critical phase where delays are costly, and grid electricity is rarely available. 

Aggreko provides the temporary power, cooling and load bank testing equipment your commissioning team needs to stay on programme, at any stage of the process.

  • Get flexible power systems for precise pre-go-live testing (L1-L5, FAT/SAT/IST).
  • Increase your speed to market with temporary temperature control, dehumidification and power.
  • Quickly meet increasing demand for data storage and processing.

From breaking ground on a new campus through FAT, SAT, and IST, our technicians are ready to solve problems at any stage during all 5 levels of Testing and Commissioning.

Effortless data centre commissioning with Aggreko
From design to operation, our infographic shows how we support every stage for seamless, reliable results.