Behind A World First Clean Energy Solution
Behind a world first clean energy solution
- The Challenge
Bringing the world’s first floating wind farm live
- The Solution
Generators to support the construction phase and battery storage to optimise output
- The Impact
With no restrictions on location, the Hywind project will enable this new playing field to boost wind power globally
Location:Offshore, North Scotland
Sectors:Renewable energy
The Challenge
Bringing the world's first floating wind farm to life
The Hywind wind farm is the world’s first floating wind farm. This leap in technology lifts restrictions on placement.
The five 6 MW wind turbines are located around 25km from land. During the construction phase, the farm needed portable power, despite its tricky location.
Not only that, but the owners of the wind farm wanted to include battery storage once the farm was producing power.
This had never been done before, but that’s why we won the contract. We provide power no matter the circumstance