Our off-grid system helped the developer stick to its schedule, which meant the turbine manufacturer’s commissioning engineers stayed on site as planned. Plus, with our comprehensive power system in place, the wind farm developer could test multiple turbines simultaneously, speeding up the commissioning process.
By avoiding a commissioning delay, the wind farm developer started exporting power as soon as that vital grid connection was made. Revenue was generated faster, and the developer met the tight deadlines of the ROC before the scheme ended.