Kaduna, Nigeria, Africa

Rescuing an off grid refinery from a loss of production

Rescuing An Off-Grid Refinery From A Loss Of Production

  • THE CHALLENGE

    Gas turbine power plant failure and long lead time for replacement parts

  • THE SOLUTION

    Rapid delivery and installation of supplementary power

  • THE IMPACT

    Power restored, full steam ahead!

Client:International Oil Company

Location:Kurdistan Region of Iraq

Sectors:Petrochemical and refining

THE CHALLENGE

Gas turbine power plant failure and long lead time for replacement parts

Our customer, an International Oil Company (IOC) operates a refinery in an off-grid remote area of the Kurdistan Region of Iraq. When a part of its 10 MW Gas Turbine power plant failed, a lead time of three months for the replacement parts meant it needed emergency assistance – fast. Facing a loss of production, the refinery knew who to call.

Fact File

10MWOff-grid power plant
3MWEmergency diesel power
3daysFrom call to commissioning
AGK_4410_CS_PCR_Afipsky_Images_3_opt.jpg

THE IMPACT

Power restored, full steam ahead!

Instead of a wait of three months, the refinery was able to return to full production within a matter of days. This bridged the gap while the IOC waited for the parts it needed to make its power plant fully functional again.