Innovative, mobile load testing solution for data centre commissioning

Innovative, mobile load testing solution for data centre commissioning

Aggreko addressed equipment shortages and tight construction timelines at a hyperscale data centre in Auckland by deploying a truck-mounted load bank and cabling setup, allowing quick relocation and minimising disruption to concurrent construction activities. This innovative solution eliminated lengthy setup and teardown times, enabling seamless commissioning and on-time project completion.
  • The Challenge

    Overcoming Equipment Shortages and Accelerated Datacenter Construction Timelines

  • The Impact

    Streamlined access clearance and elimination of setup and teardown time

  • The Solution

    Deployed Truck-Mounted Loadbank and Cabling Setup

Client:New build hyperscale data centre

Location:West Gate Auckland, New Zealand

Sectors:Data centres

The Challenge

Overcoming equipment shortages and accelerated data centre construction timelines

Our client was supporting the commissioning of UPS for a new build hyperscale data centre. This hyperscale data centre had 5 UPS in total - four 3MW loads and one 600KW load. 

The client was confronted with an absence of a suitable local load bank fleet to test their UPS. The task at hand was made even more demanding by the data centre’s concurrent construction and testing timeline. This convergence of activities compressed various scopes including construction, electrical work, civil engineering, structural adjustments, and HVAC implementation.

Civil construction works were happening simultaneously to the scheduled load testing. This also meant there would be space constraints on site.

Because various tasks were occurring simultaneously, with each one predicated on another, it was imperative for each task to progress seamlessly. Any disruptions could potentially impact the already tight deadlines. Besides this, to ensure the testing timeline could be followed, it was crucial to foresee and plan for the frequent changes that typically happens with the load testing schedule at the last minute. 

3MWReactive load banks
12.6MWTotal capacity tested
5 UPSUnits

Loading component...

Loading component...

Loading component...

We are pleased with the ease of working with the team, their flexibility, and the seamless project coordination delivered by Aggreko. This was crucial considering the tight timelines of the project with very high standards of HSE.

Hyperscale data centre , Customer testimonial