Images from the Granny Smith MIne, Australia, Solar power microgrid  project

Evolution of Granny Smith Mine's Power System

OVER 20,000 SOLAR PANELS, 2 MW OF BATTERY STORAGE AND 27 MW OF GAS POWER

Our efficient, innovative and scalable microgrid supplies power for Gold Fields' Granny Smith mine, located in Laverton, Western Australia.  The flexible power plant helps reduce fuel consumption by 10-13% for the site - which equates to 2,000 less cars on the road.

Read on to learn more about the long-term partnership between Gold Fields and Aggreko and understand the story behind the evolution of Granny Smith mine's power system from diesel to a future-proof hybrid system.

 

2016: From Diesel to Gas Power Station

The Granny Smith Mine is an underground gold mining operation located 740km northeast of Perth, Western Australia. Operated by Gold Fields, the deposit was discovered in 1979 and in 1989 mining commenced on site with the first gold being poured the year after.

Currently, Wallaby is the operation’s active mine, with mining administration and maintenance located nearby. The annual production of the Wallaby mine is in-excess of 250,000 ounces per year.

Back in 2016, Gold Fields were looking to retire their 17.9MW bank of diesel generators at the Granny Smith gold mine in Laverton. As well as this, a new gas extension was also being built nearby. 

Aggreko proposed a 22 MW gas power station, with fuel drawn from the new gas extension, powered by our new high efficiency gas-fired engines. Ultimately, this meant Gold Fields could make significant cost savings while reducing their carbon footprint at the same time. 

Our containerised gas generators built into 20-foot containers not only provide fuel savings to our clients but also have a smaller environmental footprint over competitors, who use larger units that are more expensive to transport and take up more real estate.

For the one-of-a-kind power station, we also installed a high pressure gas conditioning infrastructure and heat recovery system which optimise power station efficiency and reduce gas pressure from the gas network.

At the time of the construction, the new power station was expected to reduce the mine’s carbon dioxide emissions by approximately 80,000 tonnes over six years and enable Gold Fields to trade carbon credits with the Australian Government’s Emission Reduction Fund.

 

Loading component...

Loading component...

Learn more about transition from diesel to renewables from this video

Take a virtual tour through the Granny Smith Mine Site to find out how it has transitioned from an outdated diesel power plant through to a modern gas power station and to one of the World’s largest renewable microgrids. 

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...