Powering a data centre with a cleaner, reliable Greener Upgrades

Powering a data centre with a cleaner, reliable Greener Upgrade

Client:Data centre

Location:United Kingdom

Sectors:Data centres

The challenge

Power resilience in case of mains power failure.

Our client, an essential Government data centre, set us a challenge.
To provide an immediate back up power solution for the on-site DRUPS (Diesel Rotary Uninterruptible Power Supply) units that had been constantly malfunctioning - compromising uptime, costing time and money.
The solution would also have to be cleaner and greener to reduce emissions as much as possible.

100%Backup power
2 x 3000LitresBunded tanks
50MetresConnecting cable
18monthsFull support
2 x 500kVAStage V generators

Loading component...

Loading component...

The impact

Resilient power for over 18 months.

Challenged to provide sustainable and reliable standby power, we used Stage V generators as part of our standby power package.
Our Stage V generators are fully compliant with the European Commission’s Medium Combustion Plant Directive (MCPD). Operating in a way that limits carbon, monoxide, nitrogen oxides and particulate matter to provide efficient low carbon temporary power for the data centre.
Our temporary solution was so successful that it was still on-site 18 months later. Delivering peace of mind energy resilience, while helping to reduce emissions and costly repairs on-site.