Providing greater resilience at a critical UK Data Centre

Providing greater resilience at a critical UK Data Centre

  • The Challenge

    Bridging the energy gap with temporary standby power solutions

  • The result

    Reliable, greener power to meet every test

  • The solution

    Switching on to critical, sustainable temporary power

Client:critical UK Data Centre

Location:London, United Kingdom

Sectors:Data centres

The challenge

Bridging the energy gap with temporary standby power solutions

A lack of available grid power was causing problems for our client, raising the threat of costly delays and disruption through power failure.

This generator-free site needed three separate power feeds, but at the time of commissioning, only two were available. Our client challenged us to deliver additional redundancy through a third feed. With sustainability high on the agenda, any solution would also have to comply with ESG, and local planning and permitting requirements – meaning standard diesel generators were not an option.

13 x 1250PowerMX2 Stage V Units
138 000fuel tank capacity
5Load bank
6 x 6.3Transformers