Oil&Gas_Blog_LifeCycle
Oil&Gas

From first drill to final plug: Temporary power for the entire Oil&Gas lifecycle

Introduction
In today’s oil and gas industry, operational flexibility is more important than ever. Whetherexploring new fields, drilling, producing or decommissioning assets, energy needs varysignificantly throughout the lifecycle of a project. Investing in permanent infrastructure tooearly can lock operators into costly, inflexible systems.That’s why Aggreko delivers modular, temporary energy solutions that evolve with yourproject. Our power, cooling and heating packages are designed to adapt from day one—nomatter how remote or complex the environment.
Exploration: powering the unknown

Exploration often takes place far from existing infrastructure. Our mobile units provide powerfor:

  • Exploratory drilling rigs
  • Camp accommodation and facilities
  • Communication and safety systems 

With no need for heavy civil works, we help you reduce time to first drill while keeping yourworkforce supported.

2021-11-4471-2688-x-1512px-4-opt.jpg

Loading component...

Construction & Commissioning: a safe start

We ensure your assets are safely energised and tested before going live:

  • Temporary mini-grids for site development
  • Loadbanks for commissioning and testing
  • High-voltage generators and transformers
Drilling: stable energy and cooling performance

Drilling operations require consistent power and temperature control to maintain performanceand safety. Aggreko supports:

  • Onshore and offshore drilling rigs
  • Mud cooling systems
  • Hybrid diesel/gas solutions to lower fuel use and emissions

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...