A whitepaper to anticipate challenges of power decomissioning
Offshore decommissioning in the North Sea is accelerating, bringing with it new challenges in temporary power supply. How can we ensure operational continuity, regulatory compliance, and emissions reduction?
Aggreko and Katoni Engineering have combined their expertise to produce an exclusive whitepaper addressing these issues
Why this whitepaper?
This document is the result of a strategic collaboration between Aggreko and Katoni Engineering, combining:
- Aggreko’s logistical strength and modern fleet
- Katoni’s offshore integration expertise
Together, we offer practical solutions for safer, cleaner, and more cost-effective decommissioning.
What you will discover:
- Current and future challenges in offshore temporary power generation
- The impact of Stage V standards and their practical implications
- Integration of hybrid solutions with battery energy storage systems (BESS)
- A real-world case study showing £877,000 in savings and 4.5 tonnes of CO₂ avoided
- Our recommendations to anticipate equipment shortages and regulatory changes