  • The challenge

    Restore cooling capacity during critical site turnaround

  • The Impact

    Avoided costly delays, ensured regulatory compliance, and minimised emissions

  • The Solution

    Rapid deployment of engineered cooling towers, heat exchangers and power

Client:Chemical company specialised in materials science.

Location:Antwerp, Belgium

Sectors:Petrochemical and refining

The Challenge

Rapid cooling solution for high-stakes turnaround

A global leader in high-performance materials, faced a significant technical challenge during a planned turnaround at its Antwerp facility. The plant had to shut down its in-house cooling system, a critical process requirement, with just one week to find and implement a reliable, large-scale temporary alternative.

Having worked with Aggreko in the past on a smaller scale, the client turned to us once again—but this time, the job demanded four times the previous cooling capacity. The scale, time pressure, and technical constraints created a high-stakes environment requiring rapid, trusted support.

Fact File Heading

4Cooling towers with optimised reliability
4Heat exchangers
2Stage V power generators to ensure efficient, low-emission energy supply
7Full solution delivered and installed within one week

The Solution

Smart cooling. Safe delivery.

Aggreko responded immediately, designing and deploying a high-capacity temporary cooling system within the required timeframe. The engineered solution included:

- 4x Cooling towers with optimised reliability for continuous operation

- 4x Heat exchangers—some of the largest in our European fleet

- 2x Stage V power generators to ensure efficient, low-emission energy supply

- All associated hoses and fittings, provided with a focus on safety and regulatory compliance

Installation was further complicated by the need to place equipment at height, requiring meticulous planning and weight assessment. The success of the installation was made possible through close collaboration between our European engineering team and the client’s on-site personnel.

The Impact

Cooling delivered. Downtime avoided.

Thanks to our fast mobilisation and end-to-end support, the client was able to proceed with its turnaround on schedule—avoiding operational disruption and potentially millions of euros in lost productivity. The temporary cooling system performed flawlessly, and the customer expressed strong appreciation for the technical precision and speed of delivery.

Their operations resumed without delay, and the partnership reinforced their confidence in Aggreko’s ability to manage even the most complex cooling challenges.

What makes the difference

Solutions quickly and safely

Aggreko’s strength lies in our ability to scale proven solutions quickly and safely. Drawing from past experience with our customer, we were able to upsize an existing solution by 75% in record time.

Our wide depot network across Europe, combined with the agility of our teams, made a critical difference in this success.