Robust Integrated System Testing (IST) for new Data Centre

Robust IST for new Data Centre

Aggreko provided a digitally controlled load testing solution for a new Tier III data centre, enabling efficient and precise electrical and heat load testing. This helped the data centre achieve Uptime Institute accreditation and ensured operational resilience.
  • The Challenge

    Commissioning protocol required advanced electrical and heat load testing for large data hall to international standards

  • The Solution

    Comprehensive, cutting-edge testing solution with digitally controlled solution and synchronisation

  • The Impact

    Uptime Institute accreditation met and data centre commissioned

Client:Asian-based Co-Location player

Location:Tier 1 City, Indonesia

Sectors:Data centres

Loading component...

1,450kWCapacity of new Tier III Data Centre
1,500kWLoad test
12 X 200kWDigital Heat Load Banks
350xServer racks
21 Daysof commissioning