2017Jan-brazil-pulp-paper-industry-day-manufacturing

Power requirement for paper and pulp manufacturing plant

Quickly adapting power requirement for paper and pulp manufacturing plant

A leading paper manufacturer needed a reliable and adaptable power solution as its aging generator struggled to meet demand. Aggreko swiftly deployed 4 MW of gas power, conducted loadbank testing, and provided a scalable rental model, reducing fuel costs, improving productivity, and ensuring long-term reliability.

Client:Tempo Paper

Location:Ogun State, Nigeria

Sectors:Manufacturing

The Challenge

Provide reliable, adaptive power and testing

Tempo is a large, paper and pulp manufacturing company, based in Nigeria. It already had a large-scale power solution in place, but the 5.6 MW generator was aging and couldn’t give the customer the reliability they need.

Productivity would suffer eventually if an answer couldn’t be found. This was not an option, so Tempo began the process of looking at all the options available.

5.6 MWExisting power solution
1 WeekOf testing
4 MWGas generated power