Providing the power for a moving experience
Providing the power for a moving experience
- The Challenge
A huge piece of equipment needs to be moved 22 kms to another site but power is anaccesible
- The Solution
Complete turnkey solution of power, standby power, and 24/7 refuelling and support for a 30 day move
- The Impact
Equipment was moved for the first time ever from mine to power station
Client:AGL Loy Yang
Location:Victoria, Australia
Sectors:Mining
The Challenge
Moving a stacker across a power station and mining site in an Australian first
AGL planned to relocate Loy Yang's travelling stacker, also known as the TS4, from its external overburden site into the base of the coal mine. But with no power of its own, getting it there would require some engineering and planning feats.