Silhouette of a mining silo and conveyor belts at sunset on a Palladium Platinum Mine

Cost effective hybrid power that lowered gold production costs

Cost effective hybrid power that lowered gold production costs

  • The Challenge

    Resolute Mining Limited, an ASX and LSE listed gold mining company has produced over eight million ounces of gold from 10 gold mines.

  • The Impact

    $10 million cost savings in the first full year of operation and reduced environmental impact ensuring long term mine sustainability

  • The Solution

    As Aggreko had been providing and operating a 28 MW diesel power plant on the site that augmented the existing diesel power station for a few years, we had both the reputation and credibility to step in and offer support the optimisation and hybridisation of their plant.

Client:Resolute Mining Limited (Resolute)

Location:Mali, Africa

Sectors:Mining

Loading component...

40 %Cost reduction in COE
20 %Reduction in CO2 emissions
1stWärtsilä Modular Block Project