Enel has a longstanding relationship with Aggreko, and for the Azure Wind Project, Enel challenged Aggreko to lower emissions while still providing its superior customer service, reliability, efficiency, and engineering expertise. Aggreko rose to the challenge, producing a fully customized commissioning solution with advanced control technology and batteries that would lower emissions. A project like this would normally require three combustion generators. However, to help meet Enel’s low carbon goals, Aggreko offered an alternative solution.
Aggreko provided off-grid contingency power and a 4.5 MW hybrid grid emulation package, including two generators and one battery, integrated as a 3 MW + 1 MW BESS hybrid solution. Aggreko also implemented advanced load control systems which, combined with energy storage, reduced the system’s emissions by over 67%. By integrating energy storage, Aggreko was able to provide the same grid emulation offering with one fewer generator, significantly reducing overall fuel consumption, emissions, and maintenance, while meeting all deadlines and commercial operations dates (COD).