Load test with Aggreko
1200 kW load bank
- Loadbanks can be delivered and installed in the shortest possible time-frame to meet your needs.
- Load-testing can thoroughly prove power management systems and systems integration prior to go-live.
- Thoroughly testing power systems before they are commissioned reduces the risk of problems during commissioning, project delays and potential contract penalties.
Frequency (Hz) | 50-60 (switchable) |
---|---|
Design Load Capacity (kVA) | 890 |
Voltage (V) | 400-480 |
Height (m) | 2.25 |
---|---|
Length (m) | 2.52 |
Weight (kg) | 3200 |
Width (m) | 1.83 |
Features
- Low voltage and high voltage testing
- Remote control ( up to 1 km)
- Load bank rentals ranging in sizes from 36 kW to 6,000 kW
- Up to five units can be linked and operated from one control panel
- Compact and portable units available
Benefits
- Testing lower power factor simulation, frequency converters or full electrical system integration
- Commissioning newly installed turbine or diesel generators
- Performing maintenance testing on equipment
- Constructing a gas turbine platform and many other applications