Our solution was to provide warm water electric boilers:
- 1.8MW capacity.
- Water flow: 75m 3/h
- Temperature in: 20°C
- Temperature out: 38°C
We were able to simulate water cooled servers at 1.5MW and
test the maximum load of the chiller without any risk. For
further resilience, we could adjust the temperatures until
the chiller stopped and display the boundaries.
To ensure maximum load stability, all new chillers on site
were tested on 4 hours, 8 hours and 12 hours operation time.
Our advanced capabilities extend to displaying and
adjusting delivery temperatures and heat capacity to match
the specific requirements of the data centre. This precision
ensures that cooling systems operate within optimal
parameters, maximising efficiency and minimising energy
consumption.
With our cutting-edge control system, data centre
operators gain access to real-time monitoring of water
flow, temperatures, and heat capacity. This level of visibility
empowers proactive decision-making, allowing for
immediate adjustments to maintain optimal performance.