Temporary steam boiler solution to support during equipment testing
Temporary steam boiler solution to support during testing
- The challenge
Replacing gas powered steam boilers during testing
- The solution
5.5 T/H steam boilers integrated with the existing infrastructure
- The result
Avoiding downtime to save millions in lost production
Client:Biopharma company
Location:Scotland
Sectors:Pharmaceuticals
The challenge
Replacing gas powered steam boilers during testing
Our customer, a leading biopharma company approached Aggreko to discuss temporary steam boiler solutions with their gas units being taken offline for crucial testing. They were due to be left at a deficit of 15 T/H with 1 already out of action and others due to follow, meaning it was essential to find a swift solution to avoid downtime and production loss.
Consistent steam production is key to the company’s operations, so we devised a solution that would be in place for several months until their permanent equipment could be reinstalled.