Steam boiler - Pharmaceuticals 2

Temporary steam boiler solution to support during equipment testing

Temporary steam boiler solution to support during testing

  • The challenge

    Replacing gas powered steam boilers during testing

  • The solution

    5.5 T/H steam boilers integrated with the existing infrastructure

  • The result

    Avoiding downtime to save millions in lost production

Client:Biopharma company

Location:Scotland

Sectors:Pharmaceuticals

The challenge

Replacing gas powered steam boilers during testing

Our customer, a leading biopharma company approached Aggreko to discuss temporary steam boiler solutions with their gas units being taken offline for crucial testing. They were due to be left at a deficit of 15 T/H with 1 already out of action and others due to follow, meaning it was essential to find a swift solution to avoid downtime and production loss.

Consistent steam production is key to the company’s operations, so we devised a solution that would be in place for several months until their permanent equipment could be reinstalled.

15 T/HSteam capacity
MillionsSaved in lost production
Tailoredto suit existing infrastructure
5.5 T/HSteam boilers