Temporary heating to speed up building dry out

Temporary heating to speed up building dry out

  • The Challenge

    Heating needed to help a care home building dry out

  • The Solution

    Boilers linked to underfloor heating to speed up dry-out and equipment commissioning

  • The Impact

    Contractor saved money, space and time

Client:Robertson Construction

Location:South Shields, UK

Sectors:Construction

The challenge

To dry out the interior of a care hub building

Robertson Construction wanted help to speed up the internal dry-out phase of a care hub built in the grounds of South Tyneside District Hospital in South Shields.

There was a tight project schedule.

The building’s own heating system also needed to be tested and commissioned.

250kWBoiler linked to underfloor heating
2 x 125kWIDF heaters
6Weeks on site