ADDGAS solution providing temporary power
Providing temporary power whilst waiting for grid connection
- The Challenge
Manufacturer wanted to start production but was still waiting for grid connection
- The Solution
ADDGAS solution providing temporary power and reducing costs
- The Impact
Manufacturer could start production and reduce operating costs
Client:Global vehicle design and engineering company
Location:West Midlands, UK
Sectors:Manufacturing
The challenge
Provide power to help manufacturer commence production
A global vehicle design and engineering company built a new castings factory to serve automotive customers in the West Midlands. With the construction completed the company was keen to commission the site and commence production and asked Aggreko to provide temporary power as connection to the grid was delayed. Connection issues can be a major concern for new build industrial sites. However, the company looked to Aggreko, not only for temporary power, but also to provide an innovative, bespoke solution to reduce project operating costs.