For internal use only: Photos of product in situ (off brand) For reference only - not suitable for external marketing communications. Downloads are by request only until further notice to reduce risk of external use.

Off-grid power saves wind farm

Off-grid power keeps wind farm on track

  • The Challenge

    Wind farm faced costly delays from lack of grid power

  • The Solution

    High-voltage power generation and load bank package

  • The Impact

    Revenue generated faster and tight scheme deadline met

Client:Onshore wind farm

Location:Inverness, Scotland

Sectors:Utilities

The challenge

Powering an off-grid wind farm development

A hold up with mains grid connection was putting an onshore wind farm’s development at risk of serious delay. A lack of power would mean hold-ups in commissioning new turbines, and the developer failing to meet the deadline for its Renewables Obligation Certificate (ROC).

They also needed to keep the turbines turning to meet the manufacturer’s warranty conditions.

To keep things on track, the wind farm developer asked our renewables team to supply temporary power.

 

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

“Our high-voltage specialists worked hard to install a safe and effective power system to keep our customer’s wind farm on track.”

,

Loading component...

Loading component...

Loading component...