Client Western Power Distribution (WPD)

Location Grantham, UK

Sectors Utilities

The challenge

Quickly restore power to consumers then support repair

More than 13,000 customers were without power after one of WPD’s transformers caught fire. The fire was in the compound and the debris and heat also damaged the neighbouring secondary transformer that was being maintained at the time.

WPD needed power up quickly, then support while it repaired the transformer and brought it back online.

Project fact file

10 MVA

Customers in the Grantham area

11 kV

Generators

13,000

High voltage power package

The solution

Power back on quickly then high voltage support for repair phase

We came up with a two-phase plan, power to customers first, then a high voltage power package to get the repair underway. 
We immediately installed various sized generators to strategic locations around Grantham so customers weren’t left in the dark. 
Then we got our high voltage power package onsite to run in-sync whilst the second transformer was bought back onto the grid.

the aggreko difference

You can turn to us to help out in an emergency

The impact

Power back on for customers and breathing space to effect a repair

WPD’s 13,000 commercial and residential customers couldn’t be without power for a minute more than necessary, so getting the lights back on was our number one priority. Then we got our HV equipment onsite so the transformer could be fixed and reinstated to the grid.

We scaled our power up and down to meet fluctuating needs in sync with the network, providing a dynamically adjusted baseload grid support package.

"This was a very challenging project with quickly developing scenarios that required instant attention to detail and dynamic design.

Aggreko delivered the solution professionally and in addition answered all the support parameters required by WPD for HV grid support".

 

 

Ian Brookes Area Manager  ,
Wester Power Distribution