powering the largest data center in nigeria cost saving solution

Powering the largest data center in Nigeria when it can’t rely on the grid, a cost saving solution

Powering the largest data center in Nigeria when it can’t rely on the grid, a cost saving solution

  • The challenge

    Develop and install a cost-effective, reliable alternative to diesel backup power ensuring zero downtime

  • The solution

    Environmentally friendly gas generators installed within a tight timeline and site logistical issues

  • The impact

    Zero downtime for the data center and further development of the site to include battery storage solutions

Client:Welbeck Electricity Distribution Ltd

Location:Lagos, Nigeria

Sectors:Data centres

Loading component...

5MWgas power to site
2Weeksto install the solution at the site
5 QSK 60Gas Generators