Emergency cooling keeps steel production moving

ClientDetailsClientLabel
Steel plant  
ClientDetailsLocationLabel
Butler, PA, United States 
ClientDetailsSectorLabel
Manufacturing

Overview

The challenge

A steel mill faced immediate shutdown due to a cooling system failure

The solution

We provided a rightsized air-cooled heat exchanger that was operational within two days

The impact

2 million gallons of water and 600 MWhs electrical power saved over the course of the project

2 MillionGALLONS OF WATER SAVED
600 MWhsLESS ELECTRICAL POWER NEEDED
ZEROWATER TREATMENT CHEMICALS NEEDED