Extra offshore power for output and decommissioning 

Extra offshore power for output and decommissioning

  • The Challenge

    Modular power for platform decommissioning and extra output

  • The Solution

    A bespoke HV package dismantled into parts and reconstructed offshore

  • The Impact

    Platform life extended thanks to power package

Client:Offshore platform operator

Location:North Sea

Sectors:Oil and gas

The Challenge

Modular power for platform decommissioning and extra output

An offshore platform operator needed to increase its well output on one of its platforms. To do so, extra water injection pumps were required, but they would need extra power for the equipment to operate.

On an offshore platform, space is at a premium and there was no additional power available for the water pumps. The platform was also earmarked for future decommissioning, so a CAPEX-intensive solution was not on the cards either.

To decommission the platform, even more power would be demanded. How could the customer obtain this extra power and enable the lengthy decommissioning process, as well as increase well production?

With the help of an offshore experienced partner.

 

5MWTotal power provided
12 yearsThe time the package will be installed for
5X 1250kVAGenerators