Reducing a utility’s outage time by 99 percent

Reducing a utility’s outage time by 99 percent

  • The challenge

    Keeping customer lights on during utility upgrades

  • The solution

    A ready-to-go package with the manpower to support it

  • The impact

    Reliable power alternatives allowed successful upgrades

Client:Major utility company

Location:Trimble, Ohio, USA

Sectors:Utilities

The Challenge

Keeping customer lights on during utility upgrades

A major electric utility company was conducting upgrades to a transmission line, which would require a two-day outage to complete the work. Unfortunately, this would leave many customers without power for several hours. Immediate on-site power at 13KV was needed to keep the distribution network energized to avoid outages and unhappy customers.

Equipment would need to be deployed and set up within a week, but since hunting season was underway, no access was allowed on the site until two days before the outage was set to occur.

12 MWOf power
12 Load requirement
2,870minutes of interruption avoided