WHY LOAD TEST WITH AGGREKO?
- Loadbanks can be delivered and installed in the shortest possible time-frame to meet your needs.
- Load-testing can thoroughly prove power management systems and systems integration prior to go-live.
- Thoroughly testing power systems before they are commissioned reduces the risk of problems during commissioning, project delays and potential contract penalties.