250 kW battery
250 kW battery
Cost-Effective Power: Cost-Effective Power: Reduce fuel consumption, generator runtime, and associated costs with highly efficient energy storage that maximizes every kilowatt-hour and minimizes operational expenses. Fast, Flexible Deployment: Ready-to-go, plug-and-play design simplifies setup and commissioning, fitting seamlessly into both grid-forming and grid-following applications. Intuitive Controls: Touchscreen interface and Modbus integration allow effortless control and SCADA integration, making system management easy and accessible. All-in-One Design: Built-in HVAC, fire suppression, auxiliary power, DC collector, and hydrogen detection/purging ensure safety and reliability in any setting.
Benefits
- Reduce generator runtime, fuel consumption, and associated costs
- Store and provide energy with zero emissions
- Increase your flexibility and manage variable loads
- Optimise performance and reliability with 24/7 remote monitoring
- Deploy your 250 kW BESS fast with expert support and design
- Get everything you need in one container