Data centre commissioning
Our team of data centre commissioning specialists partner with contractors, owners and operators for comprehensive testing to ensure optimal data centre reliability
Before a data centre goes live, you need to be certain that it can rely on its critical infrastructure, no matter what. This includes load testing your data centre power, as well as heat load testing your cooling systems and chillers. We provide remote testing across the full range of test levels: from L1 factory acceptance tests to L5 integrated system tests. All with full documentation for your auditing and reporting process.
Data centre commissioning testing from Aggreko enables you to:
- Safely assess your entire power and cooling systems
- Uncover issues and resolve them before you become operational
- Go live with confidence that your critical infrastructure is ready
Contact our data centre commissioning specialists
With Aggreko, extra comes as standard
What makes Aggreko different is our deep knowledge of data centres, your operations, and how you can respond to rising demand and competitive pressures.
- Extra innovation - With green, efficient technology for data centres.
- Extra expertise - From our global network of data centre specialists.
- Extra reassurance - With robustly tested, reliable power, HVAC, and dehumidification.
- Extra flexibility - With scalable, modular equipment and a responsive global service.
Loading component...
Data centre testing solutions for peak efficiency & reliability
- Load bank testing across five data centre commissioning levels (L1-L5), carried out remotely via a hand-held device or using a laptop that utilizes our testing software. We conduct precise tests with less personnel and time, while delivering improved load reliability for your critical infrastructure. We also provide full load test documentation for quality auditing purposes, including method statements and schematics.
- Power testing using load banks, diesel generators, and LV/HV power generation to test your generators, UPS, busbars, and switchgear.
- Heat load testing to emulate the electrical IT load and heat output for your cooling systems.
- Custom engineered liquid-to-liquid solutions to ensure that your liquid cooled systems are robustly tested to operate efficiently and reliably, now and in the future.
Loading component...
Aggreko’s Greener Approach to data centre commissioning
At Aggreko, we’re committed to offering the latest technology and expert services to support our customers in their transition to a greener future. And that commitment starts at the very beginning of your data centre’s lifecycle – including during the commissioning phase.
Our data centre power and HVAC solutions are all designed to increase efficiency while lowering environmental impact.
With rightsized solutions and industry-leading equipment, you can ensure that every test is run with your sustainability goals in mind, allowing you to:
- Reduce your fuel consumption and costs
- Reduce harmful emissions (CO2, NOx, PM)
- Reduce noise pollution
- Ensure reliability and efficiency