Two trailer-mounted white Aggreko generators at a worksite and a worker next to the equipment

Data centre construction

We help data centres achieve on-time and on-budget project delivery with temporary power, cooling, heating, and dehumidification solutions throughout the different stages of construction

Aggreko can supply reliable power for even the most complex sites using diesel, gas, or hybrid generator packages. Whether the grid is unstable, unable to cope with demand or the wholesale electricity price is too high, our flexible off-grid generation options deliver reliable power demand-side.

Panels, transformers, and switchgear distribute the power to wherever it’s needed. And our temperature control solutions accelerate slow processes while keeping your project’s environment and workers safe.

Aggreko enables you to:

  • Secure greener, reliable, and scalable power for construction
  • Maintain desired humidity levels and temperatures with precise cooling, heating and dehumidification
  • Control emissions, including noise pollution in urban areas
  • Deliver your construction on-time and on-budget

Talk to an expert


 

With Aggreko, extra comes as standard

Alongside our diverse fleet of equipment, industry-leading efficiency, and superior performance, we provide the expertise and innovation you need for a successful data centre project.

  • Extra innovation - With state-of-the-art equipment, remote monitoring, and load-on-demand packages, so we respond to changing application demands, while improving fuel and equipment efficiency, reducing costs and downtime.
  • Extra expertise - With intensive induction periods and training courses for all of our engineers, and dedicated data centre-focused teams.
  • Extra reassurance - With Certified Data Centre Design Professionals (CDCDP®) on our team, who have completed a program of best practice principles for the design and construction of new build data centres.
  • Extra flexibility - With the power provided by our scalable solutions, you can adjust power, cooling, and dehumidification to your needs. We are prepared to ensure rapid deployment and access to equipment as required for all phases of the construction process, providing uninterrupted support until a permanent grid connection is established.

Loading component...

Loading component...

Loading component...

Loading component...

  • Reduce fuel consumption and cost
  • Reduce harmful emissions (CO2, NOx, PM)
  • Reduce noise pollution
  • Ensure reliability and efficiency

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...