Complex renovation of a congressional building

Complex renovation of a congressional building

  • The challenge

    Keeping humidity under control during the renovation of a historical building

  • The solution

    A concise engineered solution for all seasons

  • The impact

    Renovations conducted with no delays

Client:Kirlin Mechanical

Location:Washington, DC, USA

Sectors:Construction

The Challenge

The right conditions for a delicate task

The infrastructure and bones of historical buildings are extremely delicate. They require just the right environmental conditions to avoid causing damage, and during a renovation this is particularly difficult to achieve.

When Kirlin Mechanical was tasked with renovating the Cannon House Office Building, Washington DC’s oldest congressional building, they needed a way to keep relative humidity low and meet high power needs —  and all despite low electrical availability.

11 120 tonsAHUs
12 monthsLength of project
30-50 Relative humidity range

Loading component...

Loading component...

Getting the right equipment online during a complex building renovation and supplying the perfect solution is what we do best.