Hybrid power system reduces runtime across remote, multi-structure construction site

Client
Large construction company
Location
Southwestern United States
Sector
Construction

Overview

The challenge

A remote trailer city needed efficient and reliable power

The solution

Aggreko experts designed a smarter hybrid solution to cut down fuel consumption and costs

The impact

Generator runtimes stayed at 20-25%, keeping costs and fuel low for the large project

75-80%less fuel consumption due to minimal generator runtime
639,600 + kgCO₂e avoided in 1 year
4-hour deploymentPower operational the same day it arrived