The solution gave the customer a reliable way to keep
dredging operations moving without permanent utility
power, avoiding costly downtime and protecting project
continuity on a 16-month schedule. By running on a natural
gas-based strategy and rightsized temporary generation,
the customer achieved significant fuel and operating cost
efficiencies, delivering millions in savings over the course of
the project. What also set this deployment apart was
Aggreko’s end-to-end support model. With 24/7 coverage
from standby technicians and remote monitoring capability,
the system was continuously overseen and optimized in real
time, reducing risk and ensuring consistent performance in
a high demand marine environment. The combination of
engineered power design and technical support gave the
customer confidence to focus on production, not power
constraints.