smarter energy meets efficiency hybrid solutions for warehouse construction

Smarter energy meets efficiency: hybrid solutions for warehouse construction

Smarter energy meets efficiency: hybrid solutions for warehouse construction

  • The challenge

    Finding a cost-effective yet environmentally friendlier solution for bottling factory construction

  • The solution

    Adaptable solutions built for scale, speed, and sustainability

  • The impact

    Aggreko’s innovative hybrid power solution delivered immediate and measurable benefits

Client:A manufacturing construction firm

Location:Denver, CO

Sectors:Construction

The Challenge

Finding a cost-effective yet environmentally friendlier solution for bottling factory construction

A manufacturing construction firm was in the early stages of building a large-scale bottling factory. To power the temporary job site trailers, the construction firm’s team deployed a 50 kW diesel generator for each site trailer throughout the site. However, this setup quickly proved to be inefficient, both in quantity of fuel usage and unnecessary emissions being emitted from the site.

The generators were consistently underloaded, leading to excessive idling, unnecessary fuel consumption, and frequent manual shutdowns and restarts. The site team was frustrated by the operational inefficiencies, rising fuel costs, and environmental impact. Adding to the pressure, the factory’s end-user had made it clear: the project needed to meet stringent sustainability goals and be a greener build from start to finish.

91%Reduction in fuel consumption
89%Reduction in CO2 emissions
71%Reduction in local emissions

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...