Keeping a battery facility cool during construction

Client
Construction services and technology contractor
Location
Ontario, Canada
Sector
Construction

Overview

The challenge

A battery manufacturing facility in Ontario was under construction during peak summer months, with 700 workers expected inside the building at any given time

The solution

Aggreko designed and delivered a temporary cooling and power system engineered around the facility’s layout and construction requirements

The impact

Our engineered approach and expert support helped the customer maintain a consistent 70°F interior temperature with 1,200 tons of cooling

1,200 TNSOF COOLING CAPACITY
70°FMAINTAINED INSIDE FACILITY FOR OPTIMAL WORKER SAFETY AND COMFORT
3IDENTICAL, TURNKEY SYSTEMS DESIGNED TO SUPPLY ADEQUATE ENVIRONMENT CONTROL