Powering a factory after a fire

A long-standing partner of Aggreko, a property restoration company, brought us in to provide temporary power for their customer following a devastating electrical fire. An industrial battery manufacturer was at a complete halt and without power as a result of the fire. Replacing their damaged equipment was going to take months, so they needed a temporary power solution to help them get back up and running. A month into the project it was smooth sailing for our team, but unexpectedly a generator caught fire, triggering a succession of other issues.

The facility had already been down and without production long enough, and we couldn’t allow them to go without power again on our account. We quickly assembled a team to assess the situation and restore power and functionality to the facility.

4 MWPower Plant
350,000 sq ft.Size of facility
8 monthsLength of project

Loading component...

Loading component...

Getting the right equipment online in emergency situations is essential for the construction industry. Delivering under pressure is what we do best.

,

Loading component...

Loading component...

Loading component...

Loading component...