  • The Challenge

    Provide rapid medical relief for Covid-19 sufferers in New York

  • The Solution

    Bespoke, adaptive power solution, standby cooling and seamless collaboration

  • The Impact

    New care facility could accept and treat patients within just eight days

Client:Large electrical contractor

Location:New York

Sectors:Contracting

The Challenge

Provide rapid medical relief for Covid-19 sufferers in New York

New York has been one of the worst affected states in the US, and therefore surge capacity was urgently needed to ensure adequate medical provision for residents. The location selected for the temporary hospital was a soccer field located at an Ivy League University in New York City which did not have the power infrastructure in place to support a facility on the scale required for the medical facility.

Working alongside partners, Aggreko was tasked with designing and delivering a temporary power solution which meant that the COVID-19 Alternate Care Facility would be able to accept patients as quickly as possible.

Given that the facility would be supporting critically unwell patients, the need for reliable power 24 hours a day was absolutely vital. The team were contacted by a large electrical contractor in early April to help design and execute a temporary power solution, which could handle this power demand.

Project fact file

24 Hours a dayConstant power needed
1,500kWTotal power provided
8daysReady to accept patients within this time